mbok logo
  • About Us
  • Our Team
    • Michael Baigent
    • Orla Kelly
    • Steve Trend
  • Our Work
    • Commercial
    • Glass
    • Public Buildings
    • Residential
    • Specialist
  • Work for Us
  • Contact Us

Mews House, London W2

New build mews house

Architect: Guy Stansfeld Architects
Client: Private
Cost: £800,000

The existing factory building on this restricted mews site was demolished down to ground floor, retaining the existing basement rooms under-which were not acquired until construction of the new building was almost complete.

The simple elevation conceals the fact that the house cantilevers to over-sail a section of basement belonging to the adjacent property.

The new house was structured using a 3-D steel frame balancing on the footprint of the existing basement structure, with the overhanging elements .

Internally there is a feature staircase with structured treads clad in reconstituted stone and laser cut stepped stringers with structural glass balustrading.

project picture
project picture
project picture

© 2010 mbok Tel: +44 (0)20 8568 4871